BTS Site Survey
BTS Site Survey, providing Site Survey detail report along with built drawings / Engineering Site Survey
To work out on Site Survey Planning.
Provide Detail Site Survey Report Strictly comply to Customer Requirement.
Documentation For Site, Including Equipments Layout Drawing.
Documentation For Indoor & Outdoor Cable Routing.
Documentation For Quantities for Engineering Materials.
Provide Detail Site Survey Report Strictly comply to Customer Requirement.
Documentation For Site, Including Equipments Layout Drawing.
Documentation For Indoor & Outdoor Cable Routing.
Documentation For Quantities for Engineering Materials.
BTS Indoor Installation
BTS Indoor Installation, MBTS/BBU
Site Indoor Installation and Commisioning,RFS/RRU Tower Top Mounted
,Commissioning, Integration & ATP Sign-Off.
Un-packaging and Goods Verification and Shifting.
Installation of BTS Rack.
Power Cable and Grounding Cable routing and Terminate to MCB or IGB.
E1 Cable Routing and Punching On DDF.
Lightning Protection Box ,IGB,MCB,DDF Installation.
Alarm Cable Routing and Environment Detection Sensor Fixed.
RF Jumper Cable Connector Making
RF Jumper Cable Routing and Connect to Existing Surge Arrestor.
GPS Antenna Mount and cable routing.
Installation for Cable Tray When it required.
Labeling for all Cable and Sector.
Prepare and Submit Hardware Installation Report.
Installation of BTS Rack.
Power Cable and Grounding Cable routing and Terminate to MCB or IGB.
E1 Cable Routing and Punching On DDF.
Lightning Protection Box ,IGB,MCB,DDF Installation.
Alarm Cable Routing and Environment Detection Sensor Fixed.
RF Jumper Cable Connector Making
RF Jumper Cable Routing and Connect to Existing Surge Arrestor.
GPS Antenna Mount and cable routing.
Installation for Cable Tray When it required.
Labeling for all Cable and Sector.
Prepare and Submit Hardware Installation Report.
BTS Outdoor Installation
Installation of Antenna Pole or RRU
or MW? Pole, Hoisting of Antennas, Connectivity & Routing of Feeder
Cables, Optical cable & Power Cable Routing
3-Sectors Site Outdoor Antenna Mount.
Feeder Cable Routing, Grounding and Termination.
Surge Arrestor Installation and Grounding to OGB.
OGB & Feeder Cable Windows Installation.
Installation of Outdoor Cable Tray.
Labeling For all Cable and Sector.
Feeder Cable Routing, Grounding and Termination.
Surge Arrestor Installation and Grounding to OGB.
OGB & Feeder Cable Windows Installation.
Installation of Outdoor Cable Tray.
Labeling For all Cable and Sector.
BTS Commissioning
BTS Power on and Card Check.
Transmission Connectivity Integration.
Integrate BTS with BSC.
Call Tests and Record Result.
Integration of External Alarm and Alarm Testing.
Labeling For all Cable and Sector.
Transmission Connectivity Integration.
Integrate BTS with BSC.
Call Tests and Record Result.
Integration of External Alarm and Alarm Testing.
Labeling For all Cable and Sector.
AT
Preparing ATP Document for Testing. Arranging Testing Record.
To get Hardware Installation Acceptance Certification.
Organizing ATP testing.
Sign-off ATP Certificate.
Preparing and Submiting Site Folder.
0 comments: